In screed
The pipework is installed before screed or concrete is laid over the system.
- Best for
- New floors, extensions and any floor being dug out and rebuilt.
- Floor height
- Adds the depth of the insulation and the screed.
- Plan for
- Screed needs time to cure before the floor finish goes on.